100 Alden Street

Seashore Point, Phase 1

Seashore Point, Phase 1. [2012, Dunlap]

In 2006, management of the Cape End Manor was transferred from the Town to Deaconess Abundant Life Communities and ground was broken on the first 43 units of Seashore Point, designed by EGA Architects. The first residents, Dr. Richard and Barbara Keating of Truro, arrived in 2008. The final 38 units of the project, developed by Kenneth C. Weiss, were completed in 2014.


Seashore Point, Phase 1. [2011, Dunlap]


Seashore Point, Phase 1. [2011, Dunlap]


Seashore Point, Phase 1. [2011, Dunlap]


Seashore Point, Phase 1. [2012, Dunlap]


Seashore Point, Phase 1. [2013, Dunlap]


An aerial view shows how Seashore Point was situated between Motta Field and St. Peter’s Cemetery. [2010, Dunlap]


The blank facade of Phase 1, visible at right, was where Phase 2 would be connected five years later. [2009, Dunlap]


Side-by-side maps show the footprints of Cape End Manor and of Seashore Point, which replaced it. Seashore Point was so situated that its first phase could be constructed while the Manor still stood. [Town Map]


100 Alden Street on the Town Map, showing property lines.


Also at this address

Cape End Manor.

Seashore Point, Phase 2.